Field results, not just claims

Commercial pours with hard numbers: kg CO₂-eq/m³, MPa, dose %, and volume.

Placing ΔC concrete from a ready-mix truck at the CarbonRun silo site

Moser River, NS

CarbonRun Silo Foundation

ΔC was used in the foundation pour for CarbonRun's outdoor silo, reducing embodied carbon by 21% while surpassing target strength in just 3 days.

−21%

embodied carbon

40 MPa

at 3 days

Read the full case study
Access Nova Scotia building at Mi'kma'ki Place, Membertou, NS

Membertou, NS

Access Nova Scotia Building

ΔC was used in 70 m³ of sidewalk and curb air-entrained concrete for a new office building, reducing embodied carbon by 13% and storing approximately 40 kg CO₂e per cubic metre, while all batches exceeded the 35 MPa strength target.

−13%

embodied carbon

70 m³

placed across 12 loads

Read the full case study
Worker pouring ΔC concrete into blue Magnumstone molds at Casey Concrete plant

Nova Scotia

Casey Concrete: Magnumstone

For a precast concrete pour at Casey Concrete, MagnumStone blocks were manufactured using self consolidating concrete (SCC) with ΔC at a 5% dosage, reducing cement content by 7% and embodied carbon by 22%.

−22%

embodied carbon

7%

less cement

Read the full case study